How to:
- List work steps in "Description"
- Set maximum and minimum time need
- Estimate and sum appear!
| Description | Max. | Min. | Estimate | |
|---|---|---|---|---|
| + – ↑↓ | ||||
| + – ↑↓ | ||||
| + – ↑↓ | ||||
| + – ↑↓ | ||||
| + – ↑↓ | ||||
| + – ↑↓ | ||||
| Sum | – | – | – |
It happens easily that a work step needs double time than planned. That a step needs only half of the time, happens really rare.
This is considered in the estimate by giving the maximum time a double weighting. The formula is (max*2+min)/3.