vs Chart Tips Calculator Colors Flufo

Estimate times realistic

Description Max. Min. Estimate
+
+
+
+
+
+
Sum

How to:

  1. List work steps in "Description"
  2. Set maximum and minimum time need
  3. Estimate and sum appear!
Explanations for the time estimate:

It happens easily that a work step needs double time than planned. That a step needs only half of the time, happens really rare.
This is considered in the estimate by giving the maximum time a double weighting. The formula is (max*2+min)/3.

Tobani.com About Impressum